LEMON Manuals: Even more car manuals for everyone

Signal Circuit Inspection

  1. Ignition "OFF"
  2. Disconnect PCM and IAT sensor connector
  3. Measure the resistance between signal terminal of IATS harness connector and chassis ground.

    Specification :  Infinite

  4. Is resistance within the specification?

    YES 

    • Go to next step as below.

    NO 

    • Repair as necessary and go to W/Harness Inspection procedure .