LEMON Manuals: Even more car manuals for everyone

Control Circuit Inspection

  1. IG "OFF" and disconnect PCSV connector.
  2. IG "ON" and ENG "OFF"
  3. Measure voltage between terminal 2 of PCSV harness connector and chassis ground.

    Specification: Approx. 0 V

  4. Is the measured voltage within specification?

    YES 

    NO