LEMON Manuals: Even more car manuals for everyone

Signal Circuit Inspection

  1. Check for open in signal harness.
    1. Ignition "OFF".
    2. Disconnect PCM connector.
    3. Measure resistance between terminals 3 of sensor harness connector and 60 of the PCM harness connector.

      Specification: Approx. 0Ω

    4. Is resistance within the specification?

      YES: 

      • Go to next step below

      NO: 

  2. Check for short to ground in signal harness.
    1. Measure resistance between terminal 3 of sensor harness connector and chassis ground.

      Specification: Infinite

    2. Is resistance within the specification?

      YES: 

      NO: