Installation Procedure
Battery Positive and Negative Cable (1) - Install
- Raise and support the vehicle. Lifting and Jacking the Vehicle
- NOTE:
Generator shield is transparent.
Battery Positive Cable (3) - Install
- Generator Nut (2) - Install - Generator Replacement (LCV)
- Protective Cap (1) - Install
Battery Positive Cable (5) - Install
- Starter Solenoid Cable Nut (1) - Install - Starter Replacement (LCV - AWD) , or Starter Replacement (LCV - FWD)
- Battery Negative Cable (4) - Install
- Battery Negative Cable Ground Stud (3) - Install and tighten 40 N.m (30 lb ft)
- Engine Wiring Harness Retainer (2) - Install
- Lower the vehicle.
Electrical Connector (1) - Connect
- Battery Positive Cable Retainer (2) - Engage
- Retainer Clip (3) - Engage
Battery Positive Cable (5) - Install [3x]
- Battery Positive Cable Nut (1) - Install - Battery Distribution Engine Compartment Fuse Block Replacement (LCV, LGX)
- Battery Positive Cable Nut (3) - Install [2x] - Battery Distribution Engine Compartment Fuse Block Replacement (LCV, LGX)
- Battery Positive Cable Retainer (4) - Engage
- Battery Distribution Engine Compartment Fuse Block Cover (2) - Install
Battery Negative Cable (2) - Install
- Battery Negative Cable Ground Nut (3) @Heater Coolant Pump Bracket Bolt - Install and tighten 22 N.m (16 lb ft)
- Retainer (1) - Engage
Retainer (1) - Engage [3x]
Battery Negative Cable (1) - Install
- Battery Negative Cable Ground Nut (2) @Front End Upper Tie Bar Support - Install and tighten 22 N.m (16 lb ft)
Battery Negative Cable (2) - Install
- Battery Negative Cable Nut (1) @Battery Monitor Module - Install - Battery Monitor Module Replacement (KL9)
- Retainer (3) - Engage
CAUTION:
Refer to Fastener Caution