Installation Procedure
Electrical Connector (1) @ Power Steering Assist Motor (2) - Connect
- Retainer (4) - Engage (Qty: 3)
Battery Negative Cable (1) - Install
- Battery Negative Cable Ground Stud (2) - Install and tighten 40 N.m (30 lb ft)
- Engine Harness Retainers (3) - Engage
Battery Positive Cable (3) - Install
- Generator Nut (2) - Install and tighten 15 N.m (11 lb ft)
- Protective Cap (1) - Install
Battery Positive Cable (1) - Install
- Starter Solenoid Cable Nut (2) - Install and tighten 13 N.m (115 lb in)
Battery Positive Cable Retainer (4) - Engage (Qty: 2)
Battery Positive Cable (5) - Install (Qty: 3)
- Battery Positive Cable Nut (1) - Install and tighten 12 N.m (106 lb in)
- Battery Positive Cable Nut (3) - Install and tighten (Qty: 2) 9 N.m (80 lb in)
- Battery Distribution Engine Compartment Fuse Block Cover (2) - Install
- Battery Positive Cable Retainer (4) - Engage
- Connect the negative battery cable. Battery Negative Cable Disconnection and Connection (Without KL9) Battery Negative Cable Disconnection and Connection (With KL9)
CAUTION:
Refer to Fastener Caution