Positive Rectifiers
- Remove nuts from studs securing stator windings lead to terminal block. Lift off stator winding terminals. Carefully pry stator assembly from end shield.
- Using an ohmmeter, check for continuity between each positive rectifier and heat sink. Reverse test terminals and retest. There should be continuity in one direction only. If there is continuity in both directions, replace rectifier.