Circuit/System Verification
- Engine running measure and record the voltage at the battery terminals.
- Verify that the battery voltage is 12.6-15.5 V.
- If the battery voltage is not within the specified range, refer to Charging System Test
- Engine running, observe the scan tool ESC Battery Positive Voltage parameter.
- Verify that the scan tool displays a value that is within 2 V of the battery terminal voltage.