Installation Procedure
Battery Positive Cable - Install
- Generator Lead Nut (2) - Install and tighten 12.5 N.m (111 lb in)
- Starter Lead Nut (1) - Install and tighten 12.5 N.m (111 lb in)
- Lower the vehicle.
Retainer (1) - Install
Battery Positive Cable Nut (1) - Install and tighten 16 N.m (12 lb ft)
- Retainer (2) - Install
Retaining Tab (2) - Install [2x]
- Battery Distribution Fuse Block Cover (1) - Install
- Engine Control Module - Install - Engine Control Module Replacement
- Connect the battery negative cable. Battery Negative Cable Disconnection and Connection (2.0L LTG)
CAUTION: